Regular reports
What should a weekly agency time report include?
Link to this answer: What should a weekly agency time report include?Keep it to what someone will act on this week:
- Hours by person, against their expected hours (with leave noted).
- Billable versus non-billable hours, and billable utilization for the team.
- Hours by project or phase against budget, with anything above 75% used flagged.
- Missing or incomplete timesheets.
- A short list of exceptions: overruns, unusually high non-billable time, out-of-scope work.
One page that someone reads beats a dashboard nobody opens. Add trend lines only when a single week would mislead.
What should a client-facing time report exclude?
Link to this answer: What should a client-facing time report exclude?Anything internal: cost rates and margins, other clients' work, internal-only notes, non-billable corrections of your own errors (unless you want to show goodwill), and individual productivity comparisons.
Include what the client is paying for: hours or work by deliverable, the period covered, budget or retainer status, and clear descriptions. Review descriptions before sending; an entry written for a colleague ("redo Sam's mess") reads differently to a client.
Estimates and phases
How do I compare estimated hours with actual project hours?
Link to this answer: How do I compare estimated hours with actual project hours?Put both side by side at the same level of detail (phase or task), and calculate the variance in hours and as a percentage.
| Phase | Estimate | Actual | Variance |
|---|---|---|---|
| Discovery | 27 | 31 | +4 (+15%) |
| Design | 63 | 82 | +19 (+30%) |
| Build | 63 | 58 | −5 (−8%) |
| Launch | 27 | 24 | −3 (−11%) |
| Total | 180 | 195 | +15 (+8%) |
The total hides the story: design ran 30% over while build came in under. Review variances after every project and feed them into the next estimate.
How do I report time by project phase?
Link to this answer: How do I report time by project phase?Record time against phases from the start (phases set up in your tracker, or a Phase column in a spreadsheet), then group the report by project and phase. Show for each phase: budget, hours used, percentage used and status.
If time was not recorded by phase, you cannot reliably split it afterwards. Set phases up when the project is created; see allocating a budget across phases.
Finding problems
How do I identify clients consuming the most non-billable time?
Link to this answer: How do I identify clients consuming the most non-billable time?Report non-billable hours recorded against each client's projects for a period, sorted from highest. Show them as hours and as a share of the client's total hours, because large clients naturally have more.
A client with 40% non-billable time is absorbing a lot of unpaid effort, through extra meetings, rework or work done inside a fixed fee. Combine this with client profitability before deciding what to do.
How do I find recorded billable hours that were never invoiced?
Link to this answer: How do I find recorded billable hours that were never invoiced?Reconcile billable entries against invoices for the period. Each billable entry should be either invoiced (linked to an invoice or marked billed) or deliberately held. Anything else is unbilled.
In practice: export billable entries for the month, total them by client and project, and compare with the hours on that month's invoices. Investigate any difference: it is either revenue you have not billed or entries that should not have been billable.
How do I compare project margins across months?
Link to this answer: How do I compare project margins across months?Use the same definition every month: realized revenue recognized in the month, labor costs at the rates that applied when the work was done, and the same treatment of expenses and overhead. Then show each project's margin by month, with a total.
Watch for timing effects. A fixed-fee project invoiced at the end will show losses in early months and a large profit in the last. For those, compare cumulative margin to date with the forecast, rather than individual months.
What fields should a time-report CSV export contain?
Link to this answer: What fields should a time-report CSV export contain?Enough to rebuild any report without the original system: date, start and end time (with time zone) or duration, person, client, project, phase or task, description, tags or activity type, billable flag, hours, and, for finance, billing rate, amount, cost rate and invoice status.
| Field | Why it matters |
|---|---|
| Date, start, end, time zone | Reconstruct days and detect overlaps |
| Person | Workload, utilization and cost |
| Client, project, phase | Budgets and invoicing |
| Description, tags | Explain the work; filter activity types |
| Billable, hours | Revenue and utilization |
| Rate, amount, cost | Profitability (restricted access) |
Keep durations in a numeric form (decimal hours or minutes), not only as text like "1:30". Tools differ in what their exports include, so check a sample file from yours against this list.
How do I distinguish a staffing shortage from an estimating problem?
Link to this answer: How do I distinguish a staffing shortage from an estimating problem?Look at where the overruns happen. If most projects run over in the same phases or task types while people are working normal hours, the estimates are wrong. If projects overrun broadly, people are working sustained overtime and work is queuing or being delayed, you are short of capacity.
| Signal | Points to |
|---|---|
| Overruns concentrated in one phase or task type | Estimating |
| Projects finish on budget but late | Capacity |
| High utilization and regular overtime across the team | Capacity |
| Normal utilization, frequent budget overruns | Estimating or scope creep |
Often it is both. Fix estimates with your estimate-versus-actual history before hiring to cover a planning gap.