The anatomy of a good entry
What should a client-facing time entry description include?
Link to this answer: What should a client-facing time entry description include?Three parts: an action verb, the object of the work, and the deliverable or reference it belongs to. For example: "Drafted homepage copy for spring launch (v1)". The project, date, person and duration are separate fields, so the description only needs to explain the work itself.
| Weak | Useful |
|---|---|
| Meeting | Weekly status call: agreed launch date and asset list |
| Design | Designed three banner concepts for Q3 campaign |
| Emails | Answered questions on tracking setup; sent revised timeline |
| Admin | Prepared monthly performance report (September) |
How specific should a time entry description be?
Link to this answer: How specific should a time entry description be?Specific enough that someone who was not there can tell what was done and why it took that long; no more. One line is usually right. A three-hour entry deserves more detail than a ten-minute one.
A useful test is the invoice question: if the client asked "what was this?", could they answer it from the description alone? If yes, it is specific enough. If you need to write a paragraph, the entry probably contains several tasks and should be split.
Describing particular kinds of work
How should I describe project management work on a timesheet?
Link to this answer: How should I describe project management work on a timesheet?Name the coordination activity and what it produced, not just "project management". Examples: "Updated launch plan after date change", "Briefed developer on checkout fixes", "Prepared and sent weekly status report".
Clients question vague management time more than any other line. Concrete descriptions show that coordination produced something and make the hours easier to accept.
How should I describe client revisions on a timesheet?
Link to this answer: How should I describe client revisions on a timesheet?Include the word "revision", the round number and the source of the request: "Revision round 2: applied client feedback to homepage mockup". If a revision is outside the agreed rounds, say so ("Revision round 4, beyond scope, approved by Ana 12 May").
That consistency lets you filter all revision time later and see how many rounds each deliverable actually needed, which is the evidence you need for pricing and change requests.
How do I distinguish research from production in time entries?
Link to this answer: How do I distinguish research from production in time entries?Start the description with the activity type, or use a tag or category if your tracker has one. For example "Research: competitor pricing pages" versus "Production: pricing page copy draft".
Keeping the distinction matters because research is often where estimates go wrong. When you can total research and production separately per project, you can see whether the research share is growing and quote it explicitly next time.
Should time entries reference a deliverable?
Link to this answer: Should time entries reference a deliverable?Yes, whenever the work belongs to one. A deliverable reference ("Q3 campaign banners", "SOW-03 phase 2", "Ticket #418") is what connects the hours to the scope. Without it you cannot answer "how long did the banners take?" or compare actual time with the estimate.
If your tracker supports phases, tasks or tags for deliverables, use them instead of typing the reference each time; structured fields are easier to report on than free text.
How do I label out-of-scope time entries?
Link to this answer: How do I label out-of-scope time entries?Use a consistent, searchable marker such as an "Out of scope" tag, a dedicated task, or a prefix like "[OOS]", plus a reference to the request: "[OOS] Added Spanish version of landing page, requested by Ana 3 June".
Record these entries on the same project so the work is visible, but keep them identifiable so you can total them for a change request. If the work has not been approved yet, mark it pending rather than billable.
How do I record confidential work without exposing details?
Link to this answer: How do I record confidential work without exposing details?Describe the type of work and a neutral reference, not the confidential content. "Reviewed draft agreement, matter 2041" rather than naming parties, terms or allegations.
Agree a reference scheme with the client or your compliance owner (matter numbers, project codes) and use the same scheme everywhere. Remember that time entries are often visible to more people than the work itself: finance, other team members and sometimes the client's accounts payable team.
What is an example of a useful consulting time entry?
Link to this answer: What is an example of a useful consulting time entry?"Prepared stakeholder interview guide for operations review (12 questions); revised after call with Ana." It names the activity, the deliverable, the engagement context and the outcome in one line.
Worked example
A consulting day, described well
| Duration | Description |
|---|---|
| 1h 30m | Prepared discovery workshop agenda and exercises (Ops review, phase 1) |
| 2h 00m | Facilitated discovery workshop with operations leads (6 attendees) |
| 0h 45m | Wrote workshop summary and next steps; sent to Ana |
| 0h 20m | Internal: planned interview schedule with team |
Each line can be read on its own, ties to phase 1 of the engagement, and separates client-facing delivery from preparation and follow-up.