Recording billable time

How to record client work accurately

Timer or manual entry, five-minute tasks, switching clients, split meetings, forgotten hours and runaway timers: practical rules for an accurate record.

Updated · 5 min read · 10 questions answered

Short answer

Use a timer for focused work and manual entries for short or past tasks, and record time on the same day. Give small tasks a place (batch them into one daily entry per client), split shared meetings by agreed proportion, and reconstruct missed time from calendars and sent mail rather than guessing. Fix a timer left running by replacing its end time with the real one, never by deleting the entry.

Choosing how to capture time

Should I use a timer or enter client hours manually?

Link to this answer: Should I use a timer or enter client hours manually?

Use both, for different kinds of work. A timer is most accurate for focused blocks where you can start and stop deliberately: writing, design, analysis. Manual entry is better for short interruptions, meetings already in your calendar and anything you are recording after the fact.

What matters more than the method is when you record. Entries made the same day are far more accurate than a week reconstructed from memory on Friday afternoon. Pick whichever method you will actually use every day.

Batch them. Instead of five separate two-minute entries, keep one entry per client per day for small requests, such as "Client A: quick fixes and replies (5 items)", and add to its duration as the day goes on.

If your agreement uses a minimum billing increment (for example six minutes), apply it consistently and say so on invoices; see six-minute increments. The thing to avoid is not recording small tasks at all: ten untracked five-minute tasks a day is over four hours a week.

How do I log time when switching between clients?

Link to this answer: How do I log time when switching between clients?

Stop or switch the timer at the moment you change context, not when you remember. Most trackers let you start a new entry, which stops the previous one, in one action.

If switching is constant (an account manager answering several clients all morning), timers become friction. Record a block per client at natural breaks, for example every hour, estimating the split while it is fresh. A same-day estimate is better than an exact-looking timer that ran on the wrong client for forty minutes.

How do I split one meeting between two client projects?

Link to this answer: How do I split one meeting between two client projects?

Create two entries that add up to the meeting length, one per project, and say in each description that it was a shared meeting. Split by time actually spent on each topic if you can tell; otherwise split evenly.

Worked example

Splitting a 60-minute meeting

A planning call covered Client A's launch for about 40 minutes and Client B's report for 20. Record 40 minutes on Client A ("Joint planning call: launch timeline") and 20 minutes on Client B ("Joint planning call: monthly report"). The total is still 60 minutes, so nothing is billed twice.

Never record the full hour on both projects. That double-counts the time and, on hourly work, bills two clients for the same hour.

Should I pause my project timer during interruptions?

Link to this answer: Should I pause my project timer during interruptions?

Yes, for anything longer than a couple of minutes that is not about this project: a call from another client, lunch, a colleague's unrelated question. Leaving the timer running turns those into billed time the client did not receive.

Short pauses that are part of doing the work (thinking, re-reading the brief, a quick coffee refill) do not need to be cut out. A sensible rule is to pause for anything you would not be comfortable describing to the client as time on their project.

Unusual situations

How do I record two people working on the same task?

Link to this answer: How do I record two people working on the same task?

Each person records their own time. If two designers spend an hour together on a review, there are two one-hour entries, one per person. That is two hours of effort and, on hourly work, two hours of billable time if both people's involvement was needed.

Whether pairing is billable at both rates is a commercial decision. Some agencies bill only the senior person for reviews; others bill both. Agree it with the client, and keep both entries either way so your cost reporting is complete.

How do I track time spent waiting for client feedback?

Link to this answer: How do I track time spent waiting for client feedback?

You do not track waiting itself; you track work. Time passes while you wait for approval, but nobody is doing project work, so there is nothing to record and nothing to bill.

What you should record is any work the wait causes: chasing the approval, re-planning the schedule, keeping people available. If delays repeatedly push your team into idle or rework time, note the dates in the project record. That history supports a conversation about timelines or a change request.

How do I reconstruct client hours I forgot to record?

Link to this answer: How do I reconstruct client hours I forgot to record?

Rebuild the day from evidence, then estimate only the gaps. Good sources are your calendar, sent email, chat messages, file version history, commit logs and task updates, all of which carry timestamps.

  1. List what you did in order, using those timestamps.
  2. Assign each block to a client and project.
  3. Estimate durations conservatively, and round down when unsure.
  4. Add a note such as "Reconstructed from calendar and sent mail" so a reviewer knows it was not timed.

Do not inflate a reconstructed day to a round eight hours. If you cannot account for time, leave it out; see unexplained gaps.

How do I correct a timer left running overnight?

Link to this answer: How do I correct a timer left running overnight?

Edit the entry's end time (or duration) to when you actually stopped working. Use your last sent email, file save or chat message as evidence if you are not sure. Keep the entry and its description; do not delete it and start again, because the original start time is usually right.

Then check two things: that the corrected entry does not overlap another one, and that the day total looks plausible. If the entry was already submitted or approved, follow your team's correction process (see preserving the original entry).

Should I track hours on fixed-fee projects?

Link to this answer: Should I track hours on fixed-fee projects?

Yes. The client pays the same amount whatever the hours, but you do not incur the same cost. Hours are the only way to know whether the fee covered the work, which phases ran over, and how to price the next similar project.

Fixed-fee time is typically marked non-billable (nothing is invoiced per hour) but still assigned to the project. The guides on effective hourly rate and project budgets show what to do with those hours.

Put the answers to work
on tomorrow’s timesheet.

Try Wrap with your own team. Free for up to 10 active members.