Timesheets that hold up

Building a shared timesheet in Google Sheets

Build a Google Sheets timesheet with client dropdowns, billable checkboxes, project totals, weekly summaries, missing-entry flags and protected formulas.

Updated · 4 min read · 10 questions answered

Short answer

Keep one shared tab with a row per entry, and use dropdowns for Client and Project, checkboxes for Billable, and SUMIF, QUERY or pivot tables for summaries. Flag missing entries with conditional formatting, and protect formula columns and summary tabs so only the inputs are editable. Separate tabs per person look tidy but make reporting harder. When the sheet needs approvals, locking, rates and per-person permissions, it is time for a proper time tracker.

Structure first

Use this simplified layout for the formulas in this guide. It differs from the start/end-time layout in the Excel timesheet guide, so use these column letters: Date (A), Person (B), Client (C), Project (D), Phase (E), Description (F), Hours (G, decimal), Billable (H). The examples below assume data starts in row 2 with headers in row 1, and a separate Lists tab holding the valid clients and projects.

Should each employee have a separate timesheet tab?

Link to this answer: Should each employee have a separate timesheet tab?

Usually no. One shared entries tab with a Person column is easier to total, filter and pivot; per-person tabs force you to stitch data back together for every report and drift apart as people add their own columns.

If people should not see each other's entries, separate tabs do not help, since anyone with edit access to the file can open every tab. Use separate files that feed a summary with IMPORTRANGE, or move to a tool with per-person permissions.

How do I create a client dropdown in a Google Sheets timesheet?

Link to this answer: How do I create a client dropdown in a Google Sheets timesheet?

Select the Client column (for example C2:C), then choose Insert › Dropdown. In the rules panel, choose "Dropdown (from a range)" and point it at your client list, such as Lists!A2:A. Set invalid entries to be rejected.

Using a range means you add a new client once in Lists and every row picks it up. Google explains the options in Create an in-cell dropdown list.

How do I add a billable checkbox to a Google Sheets timesheet?

Link to this answer: How do I add a billable checkbox to a Google Sheets timesheet?

Select the Billable column (H2:H) and choose Insert › Checkbox. Ticked cells hold TRUE and unticked cells FALSE, which makes totals simple:

=SUMIF(H2:H,TRUE,G2:G) totals billable hours, and =SUMIF(H2:H,FALSE,G2:G) totals non-billable hours. See Add and use checkboxes.

How do I add project phases to a timesheet template?

Link to this answer: How do I add project phases to a timesheet template?

Add a Phase column next to Project, with its own dropdown. For phases that differ per project, keep a two-column list in Lists (Project, Phase) and filter it, or simply prefix phases with the project code ("SPR: Discovery", "SPR: Build") so one list stays readable.

Phases make the budget-by-phase comparison possible. Keep the list short; four to six phases per project is usually enough.

Summaries

How do I sum hours by project in Google Sheets?

Link to this answer: How do I sum hours by project in Google Sheets?

For one project, use SUMIF: =SUMIF(D2:D,"Spring campaign",G2:G). For every project at once, use QUERY:

=QUERY(A1:H,"select D, sum(G) where D is not null group by D order by sum(G) desc",1)

That returns a small table of projects and their total hours, sorted largest first. Google documents SUMIF and QUERY.

How do I create a weekly timesheet summary in Google Sheets?

Link to this answer: How do I create a weekly timesheet summary in Google Sheets?

Add a helper column that gives each entry's week start, then summarize by it. In I2:

=ARRAYFORMULA(IF(A2:A="",,A2:A-WEEKDAY(A2:A,2)+1))

That returns the Monday of each entry's week. Then build a pivot table (Insert › Pivot table) with Week start and Person as rows, Hours (SUM) as values, and Billable as a column if you want the split. See Create and use pivot tables.

How do I turn a daily timesheet into a monthly client summary?

Link to this answer: How do I turn a daily timesheet into a monthly client summary?

Use SUMIFS with a date range, or a pivot table filtered by month. With the month's first day in K1 and client names in J2:J:

=SUMIFS(G2:G,C2:C,J2,A2:A,">="&$K$1,A2:A,"<"&EDATE($K$1,1))

This totals each client's hours from the first of the month up to (not including) the first of the next. Add ,H2:H,TRUE for billable only. See SUMIFS.

Keeping the sheet clean

How do I flag missing time entries in Google Sheets?

Link to this answer: How do I flag missing time entries in Google Sheets?

Use conditional formatting to highlight incomplete rows. Select A2:H, open Format › Conditional formatting, choose "Custom formula is" and enter:

=AND($A2<>"",OR($D2="",$G2=""))

Any row with a date but no project or no hours turns the colour you pick. To spot people with no entries on a working day, build a small check table with =COUNTIFS($B:$B,"Ana",$A:$A,date) per person and day, and highlight zeros. See Use conditional formatting rules.

How do I protect formulas in a shared Google Sheets timesheet?

Link to this answer: How do I protect formulas in a shared Google Sheets timesheet?

Protect the formula columns and summary tabs so only you (or owners) can edit them. Select the range or tab, choose Data › Protect sheets and ranges, and set permissions to "Only you" or a named list.

For an entries tab, protect the whole sheet and add exceptions for the input columns. Protection prevents accidental edits by collaborators; people with edit access can still copy the file. See Protect, hide and edit sheets.

When should an agency replace a shared timesheet spreadsheet?

Link to this answer: When should an agency replace a shared timesheet spreadsheet?

When maintaining the sheet costs more attention than the work it records. Common signals:

  • You need approvals, locked periods or an audit history of changes.
  • Different people need different access, for example hiding cost rates.
  • Several rates, budgets or phases per project make the formulas fragile.
  • People forget to fill it in because it is not where they work, and nobody can start a timer from it.
  • Monthly reporting needs manual cleanup every time.

A spreadsheet is a good way to learn what you need. Use that list as the requirements for choosing a time tracker.

Sources

Put the answers to work
on tomorrow’s timesheet.

Try Wrap with your own team. Free for up to 10 active members.